
Formwork Sleeve
Sleeve to protect tie rod threads and release cleanly after pouring.
Factory Direct
CNC In-House
Batch QC Reports
OEM to Drawing
1 / 3Climbing Cones & Sleeves
Formwork Sleeve
A sleeve placed over the tie rod through the formwork to protect the thread and allow clean recovery after the pour. Used in water stop and climbing formwork systems.
Specifications
- Protects threads through the pour
- Allows clean rod recovery
- PP / PVC / steel core options
- Cut to wall thickness
Engineering-reviewed quote within 24 hours.
Technical Specifications
| Material | PP / PVC / steel core |
| Use | Thread protection & release |
MaterialPP / PVC / steel core
Surface FinishAs formed
Rated LoadInquire
Unit WeightInquire
PackagingCartons · bulk bags
Production Process
01
02
03
04
05
06Material Grades Explained
| Grade | Notes |
|---|---|
| Q235 | Plain carbon steel. Economic option for light and medium formwork loads. Not heat treated. |
| 45# | Medium carbon steel. The standard formwork tie rod grade in China; quenchable to class 8.8. |
| 40Cr | Alloy steel. Higher hardenability and better fatigue performance than 45#; used where repeated reuse matters. |
| Class 10.9 bolt | Quenched and tempered alloy steel bolt used in the climbing cone set. Not electroplated without a documented baking cycle. |
| QT450-10 | Ductile (nodular) iron with 450 MPa tensile and 10% elongation. Used for sleeves and embedded plates where toughness and castability matter. |
| HRB400 | Hot-rolled ribbed bar (threaded steel) to Chinese standard. Used for embedded foot bolts; good bond with concrete. |
Applications
Procurement Guide
- Provide exact wall thickness
- Confirm rod diameter
Procurement Information
- OEM / Custom
- Own drawing or label welcome
- MOQ
- Trial orders OK · mixed SKU welcome
- Lead time
- Stock 7-30d · Custom 20-35d
- Packaging
- Seaworthy: pallet + strapping + waterproof
- Payment
- T/T · L/C at sight
- Incoterms
- FOB Tianjin · CIF · CFR · EXW

Related Technical Reading
Technical FAQ
Formwork Sleeve — Answers for Engineers and Buyers
A formwork tie rod is a high-strength threaded bar that, together with nuts, anchor plates and walers, holds formwork panels against the lateral pressure of fresh concrete. It passes through the wall section and is either fully recovered after stripping (through-tie used with a sleeve) or permanently embedded (lost-end / water-stop type).

