Kait Balok Kayu
Kait penghubung untuk balok kayu H20 dalam formwork dinding dan pelat.
- Fits H20 beam flange (80mm)
- QT450-10 ductile iron hook
- Spring-loaded toothed grip
Konektor balok H20 dan klem balok kayu H20 untuk menyambung dan mengencangkan sistem formwork balok kayu H20.
Balok kayu H20 membawa beban panel kembali ke waling, dan sambungan menentukan apakah sistem tetap kaku. Seri ini mencakup konektor balok H20 yang menyambung ujung-ujung balok dan klem balok kayu H20 yang menggenggam flens balok dengan cakar baja cor.

Kait penghubung untuk balok kayu H20 dalam formwork dinding dan pelat.

Cakar baja cor menggenggam flens balok H20; sekrup dan baut menguncinya di tempat.
H20 timber beams carry the panel load back to the walers, and the beam joints are where a slab form loses its line. The H20 beam connector joins two beam ends so the splice carries moment rather than acting as a hinge; the H20 timber beam clamp grips the beam flange to fix a waler, a prop head or a bracing point without drilling the beam. Both parts are reused across many cycles, so the grip and the casting quality matter more than the unit price.
The clamp fits the standard 80 mm H20 beam flange. The hook is QT450-10 ductile iron with a spring-loaded toothed grip that bites the flange instead of relying on friction, and the wedge lock needs no tools, so it goes on and off in seconds with gloves on. Check the flange width on your beam supply before ordering — non-standard timber beams are the usual cause of a clamp that will not seat. Connectors are matched to the beam depth so the splice sits flush with the beam face.
These are long-life parts, so the order quantity follows the number of beams in the system plus spares — a clamp lost on site stops a beam from being fixed. Standard clamps and connectors ship from stock in about three days, special castings in 7–15 days. Ductile iron with black or galvanized finish; galvanized is worth specifying where beams are stored outdoors between cycles.
A formwork tie rod is a high-strength threaded bar that, together with nuts, anchor plates and walers, holds formwork panels against the lateral pressure of fresh concrete. It passes through the wall section and is either fully recovered after stripping (through-tie used with a sleeve) or permanently embedded (lost-end / water-stop type).